Project Challenge

The repairs increase at each structure adding additional work and unforeseen work. SSI is constantly adjusting the schedule and crews. The roadwork/drainage requires constant communication and coordination with various public utilities. The design requires many relocations/eliminations for SSI to install the drainage.

Project Solution

8 Bridges and a mile of road reconstruction. Bridge Painting- Lead Abatement Paint the existing steel, Steel and Concrete Repairs, Hydrodemolition Latex Overlay Replacement of Expansions Joints, Demolition and Redecking, New Storm Water Drainge, Curb, Sidewalk Ashpalt Paving. Excavation,